27 - 28 Clements Lane, London Bridge, July 08 - Dec 08
A twenty-two week contract consisting of a 6 floor fit out for MWB Business Exchange with a new data comms room added to the basement with data cabling throughout the building, full electrical rewire and upgrade to the air-conditioning system.
Each floor was split up into cellular offices using the Prima partition system apart from the 5th floor which was left open planned. The fit out included installing new toilets, disabled toilets, DDA shower and refurbishing of 15 of the existing toilets. The building was brought in line with current DDA standards including works taken place to update the passengers lift.